3D Laser Scanning · LOD 350 · MEP Coordination Modeling

LOD 350 Modeling for a School Chiller Replacement

LOD 350
Model requirement
3
Connected areas captured
2
Systems modeled
3
Model states: remain, demolish, new
Point cloud of a school mechanical room before a chiller replacement
INDUSTRY
Education
PROJECT
Chiller replacement
MODELING
Existing to remain, existing to demolish, and new design
SYSTEMS
Mechanical and electrical
MODEL REQUIREMENT
LOD 350
PROJECT OVERVIEW

The Project Need

The mechanical contractor was renovating the mechanical room of an operational school. Some existing equipment and piping would be demolished, some would remain, and the new chiller system had to fit around what stayed, with piping and ductwork running from the mechanical room through the adjacent gym to the roof. The contractor needed to know the new design would fit before fabrication and installation.

OAR'S SCOPE

LOD 350 existing-conditions and new design modeling

OAR 3D laser scanned the existing conditions, separated systems to remain from those to be demolished, and modeled the new mechanical and electrical design at LOD 350 to support coordination before installation.

OAR'S SCOPE

Capture the field condition. Separate what stays. Model the new design to fit.

01

Existing-Conditions Capture and Modeling

MECHANICAL ROOM · ADJACENT GYM · ROOF

OAR laser scanned the mechanical room, adjacent gym, and roof, and modeled existing conditions at LOD 350.

02

Existing to Remain vs. Existing to Demolish

CLASSIFICATION · DEMOLITION SCOPE

OAR separated the existing systems scheduled for demolition from those that would stay, so the new work could be modeled against the conditions that would actually remain.

03

New Design Modeled to Fit

MECHANICAL CONTRACTOR’S DESIGN · 3D GEOMETRY

OAR modeled the mechanical contractor’s design directly against the point cloud and the systems to remain, resolving fit as the model was built.

04

Coordination With the Contractor

ELEVATIONS · PIPING · EXHAUST DUCTWORK

Open items were reviewed with the mechanical contractor in coordination meetings, where several elevations were adjusted and portions of piping and exhaust ductwork were rerouted.

PROJECT OUTCOME

How the Deliverable Was Used

The mechanical contractor went to installation with a coordinated LOD 350 model of the new work and the systems that would remain. That allowed components to be prefabricated with confidence they would fit, and helped reduce field surprises and new RFIs during installation.

Project Outcome: Fit, elevations, and routing were resolved on the model before installation. For an operational school, a shorter installation window can mean the gym returns to use sooner.

Technical Scope and Deliverables

3D Laser Scanning of the mechanical room, adjacent gym, and roof

LOD 350 existing-conditions modeling

Classification of existing systems: to remain and to demolish

LOD 350 modeling of the new mechanical and electrical design

Coordination of new work with existing systems to remain

Project Visuals
PROJECT CONTEXT

What This Workflow Demonstrates

In equipment replacements, the hardest constraint is often what stays. Modeling the new design against the field condition and the systems to remain gives the mechanical contractor a clear basis for elevations, routes, and prefabrication before installation. In facilities where downtime matters, such as schools, healthcare, and labs, that typically means less time on site and less disruption to the building’s occupants.

Related OAR Services
3D Laser Scanning / Existing Conditions→
BIM Coordination & Virtual Construction→

Related projects
Aerial view of industrial facility.

Materials Recovery Facility Existing Conditions Documentation

VIEW PROJECT →
reality capture services in Maine

Waterfront Existing Conditions Documentation

VIEW PROJECT →
Architectural layout of a building.

Existing-Conditions Documentation for Two Historic Buildings

VIEW PROJECT →

Planning equipment replacement inside an existing facility?

OAR can document the field condition and model proposed work against it so your design team can review fit, clearance, and routing before installation.