BIM Coordination and Virtual Construction

Coordinate project models, review defined clashes and clearances, and manage issues.

OAR supports general contractors, VDC managers, contractors, engineers, and owners nationwide with project-based or supplemental coordination capacity.

4D BIM sequencing
WHAT BIM COORDINATION INCLUDES

A shared digital approach to project coordination

BIM Coordination & Virtual Construction brings project models, field laser scanning data, and project participants into a comprehensive review process. OAR creates a common source of project information so teams can review the same conditions, identify significant issues earlier, and make better-informed decisions before work reaches the field.

Plan the digital approach

Review project drawings, define information requirements, and determine whether existing-condition scanning or a reality-capture plan is needed.

Establish the shared environment

Develop the BIM Execution Plan, organize project documentation, and establish how contractors and other participants will exchange and review information.

Coordinate the project team

Federate models, run defined clash reviews, and facilitate coordination meetings around a common visualization so the team can address significant issues, improve plan reliability, and reduce avoidable conflicts during field installation.

WHEN TO USE BIM COORDINATION

You may need BIM coordination when…

OAR can join an established BIM workflow or provide additional coordination capacity for a defined project, phase, or program.

Mechanical, electrical, plumbing, fire-protection, structural, architectural, and equipment information may need to be reviewed together where systems share limited space or have defined clearance requirements.
Retrofit and renovation work may require new systems to relate to existing conditions, operating constraints, access requirements, and phased construction information.
The project may require an agreed process for model exchange, coordination responsibilities, issue tracking, meetings, and documented deliverables.
The team may need to review installation areas, access, sequencing information, and model interfaces before scheduled work begins. Schedule performance remains with the responsible project teams.
OAR can provide a defined coordination role when internal staff, software, or available time are limited, including support for an existing project workflow.
A structured coordination process can organize model updates, issue status, responsibilities, and review points as project information develops.
THE OAR COORDINATION WORKFLOW

From project requirements to agreed delivery

The inputs, participants, review cadence, issue criteria, authoring responsibilities, and final deliverables are confirmed for each project.

Confirm the available models, drawings, scan data, coordinates, responsibilities, milestones, review criteria, and required outputs.

Organize the agreed discipline information and apply project-defined rules to review clashes, clearances, access requirements, and selected interfaces.

Create issue records, assign responsibility, support review cycles, and track updated information according to the agreed workflow.

Prepare the federated models, issue status, reports, views, drawings, or handoff documentation included in the project scope.

CONNECTED SERVICES

Connect coordination to the information your team needs next

BIM coordination can stand alone or connect to field documentation, model handoff, digital-delivery workflows, and implementation support when those services are part of the project scope.

3D Laser Scanning & Existing Conditions

When coordination depends on current field conditions, OAR can assess whether scan data or other verified documentation is needed. A coordinated model is not automatically a field-verified as-built.

Digital Delivery & Implementation

Connect agreed coordination information to model handoff, a Common Data Environment, documented workflows, platform setup, or team training when included in scope.
OUR PROJECTS

See how the work comes together

FAQs

Clash detection reviews defined model interfaces and identifies modeled intersections or clearance issues according to project criteria. It is one activity within the broader BIM coordination process.

The scope may include architectural, structural, mechanical, electrical, plumbing, fire-protection, process equipment, vendor, and existing-condition information when the required models and responsibilities are defined.

Not necessarily. OAR can coordinate models provided by project participants and can develop selected model content only when that authoring work is included in the agreed scope.

The responsible designers, engineers, contractors, fabricators, and trades approve and implement changes within their professional and contractual responsibilities. OAR’s role is defined by its contracted coordination scope.

Timing depends on model readiness, project size, disciplines, issue volume, review cycles, participant response times, and required deliverables. OAR proposes the workflow and schedule after reviewing the project.

Yes, coordination can be performed remotely for projects across the United States. On-site participation, existing-condition capture, and project-specific platform or travel requirements are confirmed during scoping.